All categories
Featured selections
Trade Assurance
Buyer Central
Help Center
Get the app
Become a supplier

PPR water supply pipe 20-140mm prices

No reviews yet
Henan Hesu Group Co., Ltd.Brand holder6 yrsCN

Key attributes

Industry-specific attributes

Processing Service
Moulding, Cutting

Other attributes

Place of Origin
Henan, China

Brand Name
Hesu

Model Number
A033

Material
PP

Specification
20mm-130mm

Length
8 or as required

Thickness
2-14mm

Standard
GB/T13663-2000

Color
multicolored

Model Number
S4

Certification
ISO CE IAF

guarantee
50 years

Application
water supply and heating system

Product name
S4 PPR Pipe

Feature
Lightweight

Usage
WaterSupply

Temperature
0℃-95℃

standard
GB/T18742-2002

Packaging and delivery

Packaging Details
at least 4m/package or as customer required.

Port
Shanghai/Tianjin/Qingdao Port

Supply Ability

Supply Ability
3000 Meter/Meters per Day

Lead time

Quantity (meters)1 - 50005001 - 2000020001 - 50000 > 50000
Lead time (days)3710To be negotiated
Still deciding? Get samples first! Order sample

Samples

Maximum order quantity: 1 meter
Sample price:
$1.00/meter

Customization

Customized logo
Min. order: 5000
Customized packaging
Min. order: 5000
Graphic customization
Min. order: 5000

Know your supplier

Brand holder6 Located in CN
Registered trademarks (2)
Quality control

Product descriptions from the supplier

Minimum order quantity: 8 meters
$0.10 - $0.55

Quantity

Shipping

Shipping solutions for the selected quantity are currently unavailable
Item subtotal (0 variations 0 items)
$0.00
Shipping total
$0.00
Subtotal
$0.00
Still deciding? Get samples first! Order sample

Samples

Maximum order quantity: 1 meter
Sample price:
$1.00/meter

Membership benefits

3-day coupon giveaway: up to US $80 offClaim now

Purchase details
Protection with

Secure payments

Every payment you make on Alibaba.com is secured with strict SSL encryption and PCI DSS data protection protocols

Refund policy

Claim a refund if your order doesn't ship, is missing, or arrives with product issues